|
Cellgate resolved their issue and the visitor gate resumed normal operation.
There is a known issue with the visitor callbox not passing phone calls to the app. This is not an isolated issue. Cellgate confirmed this has affected multiple neighborhoods. We are leaving the visitor gate open until this issue is resolved. Please continue to use the resident lane for vehicles with resident transponder stickers.
The gates are now fully operational. Please be prepared with a QR code for yourself in case of any entry issues, and please prepare your visitors to use the visitor call box. If you are having trouble with the resident arm or find that your sticker doesn't work, please email "Gates" to report the issue or order a new sticker.
AEI has confirmed that our new Magnetics resident gate operator is officially in transit and expected to arrive next week. Because it is shipping from overseas, exact arrival days can fluctuate, but we are tracking it closely.
Once the hardware lands, AEI will schedule the installation. We will send out the exact installation date as soon as it is locked in. Our warranty replacement Cellgate visitor callbox is scheduled for installation tomorrow. Liftmaster continues to be unable to fix our resident arm operator.
The pool has been cleared by the pool company and is officially reopened for swimming.
Thank you all so much for your patience while we got everything cleaned, balanced, and ready to go. The pool is temporarily closed until further notice due to an unexpected sanitation issue. We're performing a thorough cleaning and shocking the water to make sure it's safe to swim in again.
As a reminder, swim diapers are required for all non-potty-trained children to help us avoid these sudden closures. We'll let you know as soon as it's reopened. Thanks for your patience! AEI conducted full-day wire tracing to isolate voltage interference. LiftMaster and Cellgate warranty parts did not arrive in time for Wednesday's visit, but are expected shortly. They will return Monday to strip out all legacy Envera wiring across the barrier arms and swing gates, rewiring the entire system from scratch with only essential connections.
The next phase of installation is set for Wednesday once the new Cellgate callbox arrives. Additionally, LiftMaster is supplying another warranty part for the resident gate arm next week.
New gate pole was installed today to replaced the damaged one. Electrical box was relocated to its own pole and wiring rerun. Tomorrow AEI will finish the Liftmaster part replacement and cellgate re-installation.
|
© 2026 Stonegate of Pasco Homeowners Association, Inc.
RSS Feed